QuantityWare Home > Support > Knowledge Base
All
Consulting & Working Papers
Contracts
Manuals
Notes
All
BCG
BCP
QAPI
All
Advanced Development
Consulting & Configuration
Correction - Calculations
Correction - PMC & GMC
Correction - SAP Integration
Documentation
Technical Information
Usage Definitions| File | Document Type | Category | Date | BCS Products |
|---|---|---|---|---|
|
Bulk Calculations Gas BCG 3.0 - Reference Manual
Documents all aspects of the BCG solution: Cockpit, Test Scenarios, Reference Template, MQCI, Customizing Transactions, N.G. Component Physical Properties Data, NG and LNG Measurement, Security, IP statement, Abbreviations, Documentation Rules and Basic System Settings (134 pages) Type: Manuals Category: Documentation Date: 2026-03-05 Products: BCG |
Manuals | Documentation | 2026-03-05 | |
|
QuantityWare Remote Support Manual - Analysis of Calculation Results
This document must be followed when reporting a calculation issue to QuantityWare via the Support Portal. |
Manuals | Documentation | 2026-03-03 | |
|
Note 000067 - BCS 3.0 Additional Installation / Upgrade Information
"Must-Read" information for installation of BCS, or the upgrading of BCS or BCP installations. (15 pages) Type: Notes Category: Technical Information Date: 2026-02-10 Products: BCP, BCG |
Notes | Technical Information | 2026-02-10 | |
|
Note 000126 - ISO 6578:2025 - Compliance Enhancements
Support for ISO 6578 “Refrigerated hydrocarbon liquids — Static measurement — Calculation procedure” released in October 2025 (ISO 6578:2025). (3 pages) Type: Notes Category: Advanced Development Date: 2026-02-10 Products: BCP, BCG |
Notes | Advanced Development | 2026-02-10 | |
|
Bulk Calculations Petroleum BCP 3.0 - Project Assessment and Implementation Guidelines (PAIG)
Enables customers and consultants to leverage a "Best Practices" project structure and, at a high level, define the time and resources required to complete a specific set of tasks that have been proven to lead to a comprehensive implementation. (32 pages) Type: Manuals Category: Documentation Date: 2026-02-03 Products: BCP |
Manuals | Documentation | 2026-02-03 | |
|
Note 000086 - Support and Release (Lifecycle) Details
Provides customers or prospective customers with information about QuantityWare (QW) release levels, release strategy and support lifecycles. (7 pages) Type: Notes Category: Technical Information Date: 2026-02-02 Products: BCP, BCG |
Notes | Technical Information | 2026-02-02 | |
|
QAPI - Connection Guide
The QAPI functions reside on the SAP Oil, Gas, and Energy system in which QuantityWare BCS has been installed on either an S/4 HANA or ECC system. This document provides a comprehensive guide for connecting to the QAPI functions via SAP BTP. (78 pages) Type: Manuals Category: Documentation Date: 2026-01-29 Products: QAPI |
Manuals | Documentation | 2026-01-29 | |
|
Bulk Calculations Petroleum BCP 3.0 - Supported Standards Manual
A complete definition of all measurement standards supported by BCP. E.g. calculation models, CTPL, mass / weight & UoM conversion factor standards and BCP Installation Test details. (28 pages) Type: Manuals Category: Documentation Date: 2026-01-06 Products: BCP |
Manuals | Documentation | 2026-01-06 | |
|
Bulk Calculations Gas BCG 3.0 - Supported Standards Manual
A complete definition of all standards supported by BCG. E.g., calculation models, calculation of densities & heating values from composition, compression factor standards, UoM conversion factors and physical property range limits, as well as BCG Installation Test details. (24 pages) Type: Manuals Category: Documentation Date: 2026-01-06 Products: BCG |
Manuals | Documentation | 2026-01-06 | |
|
Test Software Usage Agreement
BCS Service Test Agreement - To be agreed to and abided by when using the products, services or information for testing non productive purposes. (18 pages) Type: Contracts Category: Usage Definitions Date: 2025-12-01 Products: BCP, BCG |
Contracts | Usage Definitions | 2025-12-01 | |